Weil-McLain 88 Water and steam boilers — Series 2 — for Gas, Light Oil, & Gas/Light Oil-Fired Burners
4 Part No. 550-100-068/0308
Installation must comply with —
State, provincial and local plumbing, heating and electrical 1.
codes.
Regulations of servicing utilities.2.
ASME Section IV, Low Pressure Boiler and Pressure Vessel Code.3.
National Fuel Gas Code, ANSI/NFPA 54, when applicable.4.
National codes where applicable.5.
Before selecting boiler location
Check for nearby connections to:1.
Fuel supply.a.
Electrical power.b.
System water or steam piping.c.
Venting systems - see d. page 29.
Combustion and ventilation air supply — see e. page 5.
Check area around boiler. Remove any combustible materials, 2.
gasoline and other ammable vapors and liquids.
Failure to keep boiler area clear and free of combustible
materials, gasoline and other ammable liquids and
vapors can result in severe personal injury, death and
substantial property damage.
Provide clearance around boiler
Provide minimum clearances to combustible materials:1.
• — 24 inches.
• — 48 inches.
• — 9 inches.
• — 9 inches.
• — 6 inches.
• – 18 inches.
• – refer to vent pipe manufacturer's
recommendations for vent pipe clearances.
Boiler may be installed on combustible ooring.2.
See 3. page 36 for boiler dimensions.
Flue pipe/breeching clearances take precedence over
jacket clearances.
Provide minimum clearances for servicing:4.
• — for cleaning and tankless heater removal –
39 inches.
• — for breeching — 36 inches.
Allow sufficient space on remaining sides for cleaning, servicing •
and burner installation. See burner literature for length and
recommended service clearances.
Lay a foundation, if needed
Floor construction and condition must be suitable for weight of 1.
boiler when filled with water. See page 36 for approximate boiler
operating weight.
A level concrete or brick foundation, constructed per 2. Figure 1 and
Figure 2 is required when:
A oor could possibly become ooded.a.
Non-level conditions exist.b.
Before installing boiler
Boiler foundation, when required
Boiler foundation (see  Figure 1)



L
(inches)
488
33
588
41
688
49
788
57
888
65
988
73
1088
81
1188
89
1288
97
1388
105
1488
113
1588
121
1688
129
1788
137
1888
145