Bunn ITCB-DV HV SONAR User Manual


 
INTRODUCTION
This instruction details installation of the transformer kit to convert a 120V (2 wire w/ground) or 120/240V (3
wire w/ground) SINGLE or TWIN to a 208V (2 wire w/ground).
NOTE: This procedure should only be performed by a trained technician.
CONTENTS
ITEM PART NO. QTY. DESCRIPTION
1 43218.0001 1 Transformer/Bracket Assembly
2 02308.0000 2 Screws
3a 42995.0000 1 Decal, Wiring Diagram (SINGLE)
3b 42995.0001 1 Decal, Wiring Diagram (TWIN)
4a 42947.0000 1 Wiring Harness (SINGLE Only)
4b 42947.0001 1 Wiring Harness (TWINS Only)
5 42925.0002 1 Instructions
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
42925.0002A 02/11 ©2011 Bunn-O-Matic Corporation
MODEL ICB/TWIN/
ITCB-DV HV/
ITCB HV TWIN
CONTINUED
1. Make sure the unit is unplugged.
2. Remove the front panel by loosening the (6) screws. Save
screws.
3. Remove the white and black power cord wires from the terminal
block, and remove the ground screw. Save ground screw. Loosen
the screws on the strain relief and remove & discard the 120V
power cord.
4. Remove the red/black 2-wire harness that connects the terminal
block to the master on/off switch. Discard harness.
5. Remove the component bracket by removing the 2 screws
connecting the bracket to the base. Save screws.
6. Use the drill hole pattern to drill (2) holes in the base. FIG 1
ICB, FIG 2 ITCB-DV HV
7. Mount the component bracket to the transformer bracket with
saved screws from step 5.
FIG 1
3-wire (no neutral) transformer conversion kit instructions
Center the template between
the support channels under the
base plate. Mark/drill holes
8.0" from back of brewer.
TRANSFORMER/BRACKET INSTRUCTIONS
FIG 2
¾˝
ICB/ITCB-DV HV