FireFly™ Inatable Kayak Owner’s Manual
9
Diagram of Ination Chambers
3.3 Inating
IMPORTANT: Inate your kayak in the following order. Failure to follow these instructions
maycausedamagetoyourkayak.Donotoverinate.When fully inated, the width of the
seating area should be between 15” to 16” at the widest point.
1. Inate chamber 1 “main” until the kayak feels rm to the touch. Neverover-inate!
2. Inate chamber 2 “oor” (using appropriate ing) until rm (1.0 psi ONLY).
3. Make sure all valves are closed tightly and properly.
3.4 OverInation
CAUTION: Water temperature and weather will aect the air pressure of the kayak. In cold
weather and water your kayak will lose some pressure. If this occurs, you may want to add a
bit more air to the kayak to improve performance. In hot weather or prolonged sunlight, the air
inside the kayak will expand. You must let some air out of the appropriate chambers to prevent
the kayak from failing due to overpressure. You should avoid exposing your kayak to extreme
temperatures (hot or cold).
3.5 Deation
1. Remove the cap from chamber 1.
2. Push stem inward and rotate to deate position.
3. Twist the valve body open on chamber 2.
4. Once the chambers are deated you can use your pump to vacuum out any additional air for
improve folding.