A SERVICE OF

logo

Page 16
SKU 93167 For technical questions, please call 1-800-444-3353
Boom Controls
Boom Operation
1. With the Engine running, sit in the operator Seat (76) and pull the Main Boom handle
control backward to raise the Main Boom (44).
2. Pull back on the Boom Extension handle control to raise the Boom Extension (47).
3. Push forward on the Bucket handle control to open the Bucket Assy. (48).
4. Push forward on the Main Boom handle to lower the Main Boom until the Bucket Assy.
reaches the ground.
5. Pull back on the Bucket handle control until the Bucket scoops up the dirt.
6. Pull back on both the Main Boom and Boom Extension control handles to raise the
load.
7. Press in, or pull out, the Boom Swing control handle to move the Bucket left or right.
Note: The Boom’s travel is 60 degrees left and 60 degrees right.
8. Press in on the Bucket control handle to dump the load.
Moving the Trencher
1. One method for moving the trencher around the work area is by using the Boom to push
the Trencher across the ground.
WARNING: This technique can be difficult to control and should only be attempted by
an experienced operator. The stability of the Trencher is totally dependent on the
stability of the ground that the trencher is working on; if you choose to move the
REV 05j