DEALER PREPARATION CHECK LIST
RDTH ROTARY CUTTER
BEFORE DELIVERING MACHINE — The following check list should be completed.
Use the Operator’s Manual as a guide.
❒ 1. Assembled completed.
❒ 2. Gearbox filled with oil.
❒ 3. All fittings lubricated.
❒ 4. All shields in place and in good condition.
❒ 5. All fasteners torqued to specifications given in Torque Chart.
❒ 6. All decals in place and readable. (See decal page.)
❒ 7. Overall condition good. (i.e. paint, welds)
❒ 8. Operators manual has been delivered to owner and he has been instructed
on the safe and proper use of the cutter.
Dealers’s Signature
Purchaser’s Signature
THIS CHECKLIST TO REMAIN IN OPERATOR’S MANUAL
It is the responsibility of the dealer to complete the procedures listed
above before delivery of this implement to the customer.
3