CH270 Installation Supplement Contents
The following checklist and information sheets are provided to help you properly and efficiently
install your CH270 sonar. If this is a high speed vessel, please pay careful attention to the tube length
and fairing instructions.
Page
1-2 Overall installation checklist - Please return a completed copy to Furuno U.S.A.
3 Fiberglass (FRP) sonar tube installation outline drawing
4-6 High speed hull, sonar tube fairing pictures with comment
7 Tank guide assembly installation and adjustment instructions
8 Motion sensor mounting, location and longer interconnect cables
8 Soundome cover removal and oil installation reminder
9 Checking soundome when in drydock
Please feel free to contact us with any questions that you may have.Additional information such as
this may be found on our web site www.Furuno.com.
This material is provided to augment, not replace, what is found in your CH270 manuals.