CH270 Installation Check Sheet
Vessel Information CH270 System Information
Vessel Name: CH270 Model:
Type: Use: Serial Number:
Length: Registry: Shaft Travel:
Operating Speed: Hull Type: System Input Voltage:
Dealer Information
Dealer Name:
Address: City, State, Zip:
Installed By:
Date: Location:
Standard System – MU100C Display Check List
Are all cables and connections tight & strapped?
❏ Yes ❏ No
Is NMEA data connected and activated? ❏ Yes ❏ No
What NMEA devices are connected:
Has CH252 control head installation & operation been checked?
❏ Yes ❏ No
Is the unit grounded properly?
❏ Yes ❏ No
OR
Black Box System – VGA Display Check List
Are all cables and connections tight & strapped?
❏ Yes ❏ No
Does the monitor display the correct color palette?
❏ Yes ❏ No
Are the IF8000 dip switches set correctly?
❏ Yes ❏ No
Is NMEA data connected and activated?
❏ Yes ❏ No
What NMEA devices are connected:
Has CH252 control head installation & operation been checked? ❏ Yes ❏ No
Is the unit grounded properly?
❏ Yes ❏ No
CH273 Transceiver Unit Check List
Are all cables and connections tight & strapped?
❏ Yes ❏ No
Check and note actual input voltage
Is the unit grounded properly? ❏ Yes ❏ No
Motion Sensor or Incinometer Check List
Which sensor is being used, BS704 or MS100? ❏ BS704 ❏ MS100
Where is the sensor located?
Has the sonar been programmed to look for the sensor?
❏ Yes ❏ No
Sonar Tube Installation Check List
Was a Furuno supplied sonar tube used?
❏ Yes ❏ No
If not, what was the ID of the sonar tube used?
What is the actual length of the sonar tube?
Where is the sonar tube mounted?
Is the sonar tube on or off the vessels centerline?
❏ On ❏ Off
Has a sonar tube air venting system been installed?
❏ Yes ❏ No
Has a forward sonar tube fairing been installed?
❏ Yes ❏ No
Page 1