GE EPM 5200 Marine Instruments User Manual


 
CHAPTER 9: PROGRAMMING GROUP 0 - GLOBAL METER SETUP GROUP 0, FUNCTION 3 — SYSTEM CONFIGURATION
EPM 5300 SERIES ADVANCED POWER METERS – INSTRUCTION MANUAL 9–59
9.3.2 Switching Communication Protocols, EI-BUS, MODBUS RTU/ASCII, DNP 3.0
For EI-BUS protocol: PACK 2, Switch C is DOWN, Switch D is DOWN.
For MODBUS protocol, ASCII framing: PACK 2, Switch C is UP, Switch D is UP.
For MODBUS protocol, RTU framing: PACK 2, Switch C is DOWN Switch D is UP.
For DNP 3.0 protocol: PACK 2, Switch C is UP, Switch D is DOWN.
Note
When programming for MODBUS protocol configuration of LIPA (Long Island
Power Authority) mapping options may be performed through communication.