A SERVICE OF

logo

6
Fig. 1 - Interconnection Diagram
UEC-8 CONTROL
P10
VIO
RED
BLU
P11
BLU
VIO
YEL
P6
P7
P8
P9
DC AMMETER
W/TRMPOT
DC VOLTMETER
4 COND. GOV CABLE
2 FT. - 997965
'J' GOV.
2 COND. CARRIAGE
CABLE, 10-IN. - 948226
OM-48 CARRIAGE
EH-9 MOTOR
BUSBAR
NOZZLE
650 cvcc POWER SOURCE
WIRE FEED MOTOR
2 - SINGLE COND. CABLES
6-FT. ASSY. - 996806
(also see III-A-2)
12 COND. CABLE
25-FT. 34135
(OPTONAL EXT. CABLE, see III-A-1
19-PIN
4/0 CABLES TO WORKPIECE
4/0 CABLE TO NOZZLE BUSBAR
3 COND. CABLE
SUPPLIED WITH WIRE
FEED MOTOR, see
Note 1 or 2.
STRAIN LEFT
TB1-7
TB1-6
TB1-8
TB1-5
4/0 CABLES TO TERMINAL
ON POWER SUPPLY
See Note 3
4/0 CABLES TO TERMINAL
ON POWER SUPPLY
NOTES
1. If shunt wound motor does NOT have mating plug for UEC-8 motor
receptacle (P7) use connector plug 996513 & cable clamp 525564
and wire per chart-1.
2. If permanent magnet motor does NOT have mating plug for UEC-8
motor receptacle (P7) use above plug and cable clamp and wire per
chart-2.
3. The work voltage pick-up lead must be corrected as shown from the
workpiece. This function is also provided from the power supply thru
P6-1 to TB1-6 in the UEC-8 (via a faston connection). This connection
must be disconnected and taped.
CHART 2
WIRE COLOR PIN
ARM (-), GRN C
ARM (+), WHT D
GND, GRN E
CHART 1
WIRE COLOR PIN
FIELD (-), BLK A
FIELD (+), RED B
ARM (-), GRN C
ARM (+), WHT D