A SERVICE OF

logo

,
All work on the electrical
connection must be carried out by
Miele Service.
The electrical installation must be in
compliance with current local and
national safety regulations.
The plug connection must comply
with national regulations. (The
electrical outlet must be accessible
after the appliance has been
installed.) This facilitates access for
electrical safety checks, for example
when the appliance is being repaired
or serviced.
If the appliance is hard wired, a
multiple-pole circuit breaker must be
installed. The contact opening at the
main breaker must be at least 3 mm
wide and lockable in the open
position.
If necessary, an equalization of the
potentials must be carried out.
If replacing the power cord, use only
original Miele replacement parts or a
suitable cord with core cable ends.
For technical data, see the data plate
or the attached wiring diagram!
The commercial dishwasher must only
be operated with the voltage, frequency
and fuse rating shown on the data
plate.
A conversion may only be performed
according to the attached conversion
diagram and wiring diagram.
Converting the machine to a
different type of power supply can
lead to longer program runtimes
resulting in increased energy
consumption.
The values declared on the label will
only be achieved if the machine
remains in the state it was delivered
in.
The data plates are at the back of the
commercial dishwasher and along the
right edge of the open door.
The wiring diagram comes with the
commercial dishwasher.
The conversion diagram is attached to
the base panel behind the plastic base
cover.
Electrical connection
68