Page iv GTX 330 Installation Manual
Revision G 190-00207-02
PARAGRAPH PAGE
5 POST INSTALLATION CONFIGURATION AND CHECKOUT PROCEDURE.........................5-1
5.1 Operation ...........................................................................................................................................5-1
5.2 Configuration Pages...........................................................................................................................5-5
APPENDIX A CERTIFICATION DOCUMENTS
A.1 STC...................................................................................................................................................A-1
A.2 Continued Airworthiness ..................................................................................................................A-3
A.3 Environmental Qualification Forms, GTX 330 Mode S Transponder ........................................A-5
APPENDIX B ASSEMBLY AND INSTALLATION DRAWINGS
APPENDIX C INTERCONNECT DRAWINGS