PAGE 38 — DCA-25SSAI — PARTS AND OPERATION MANUAL—FINAL COPY (06/30/01)
General Inspection Prior to Operation
The DCA-25SSAI generator has been thoroughly inspected
and accepted prior to shipment from the factory. However,
be sure to check for damaged parts or components, or loose
nuts and bolts, which could have occurred in transit.
Extension Cable
When electric power is to be provided to various tools or
loads at some distance from the generator, extension
cords are normally used. Cables should be sized to allow
for distance in length and amperage so that the voltage
drop between the generator and point of use (load) is held
to a minimum. Use the Cable Selection Guide (Table 9)
as a guide for selecting proper cable size.
Circuit Breakers
To protect the generator from an overload, a 3-pole, 60 amp,
main main
main main
main
circuit breaker is provided to protect the UVW output
terminals from overload. In addition two single-pole, 20 amp
GFCIGFCI
GFCIGFCI
GFCI
circuit breakers are provided to protect the GFCI
receptacles from overload. Three 50 amp
loadload
loadload
load
circuit breakers
have also been provided to protect the load side of the
generator from overload. Make sure to switch
ALLALL
ALLALL
ALL
circuit
breakers to the "OFF" position prior to starting the engine.
DCA-25SSAI — PRE-SETUP
)noitarepOesahPelgniS,zH06(noitceleSelbaC.9elbaT
nitnerruC
serepmA
sttaWnIdaoLhtgneLelbaCelbawollAmumixaM
021tA
stloV
042tA
stloV
eriW01#eriW21#eriW41#eriW61#
5.2003006.tf0001.tf006.tf573.tf052
50060021.tf005.tf003.tf002.tf521
5.70090081.tf053.tf002.tf521.tf001
0100210042.tf052.tf051.tf001
5100810063.tf051.tf001.tf56
0200420084.tf521.tf57.tf05
.egatlovwolmorftlusernacegamadtnempiuqE:NOITUAC
ALWAYS consult with a licensed
electrician for correct extension
cord wire size.
NOTE