Sherwood REGULATORS Scuba Diving Equipment User Manual


 
3.0 O-RINGS REFERENCE CHART
1. Before you begin disassembly of the regulator, test the first and second stages for output
pressures and leakage. Pre-testing in this way will help the technician to pinpoint any specific
problems requiring repair.
2. The work area must be clean and well lighted, with clean compressed air available to blow
sand and dirt from parts.
4
G907A
Seals second stage
orifice
to case
G022A
Large End of
piston
G122A
Seals cap to body
G007A
Moving orifice, small
end of piston
G0101A
Outlet end of hose
G011B
L.P. port plug, inlet end
of hose
G904A
Under filter in first stage
H.P. port plug