Section 1.0 — Installing the EEC4
1
1.0 Installing the EEC4
The installation process includes the following six steps:
STEP 1: Pre-installation planning (the most important part of the process)
STEP 2: Mount the EEC4 Control Processor
STEP 3: Control Head(s) Installation
STEP 4: Station Communication Cable Routing
STEP 5: Engine Compartment Wiring
STEP 6: Operational Test
1.1 Pre-Installation Planning
Before beginning the installation of the Glendinning EEC4 System, it is very important that some
thought be given to the overall installation. The following should be considered:
— Control Processor location
— Power / Battery supply
— Station Communication Cable routing
STBDEngine
PORTEngine
Circuit
Breaker
Circuit
Breaker
Battery
#1
Battery
#2
+
+
-
-
DCPowerHarness
StationCable
ToStartInterlockCntr.
MainHelmStation
Bondsystem
toveselbond
p
erABYCs
pes.
Terminating
Resistor
Batteriesmusthave
acommonground
ToThrottleCntr.
GearHarness
EngineHarness20'
Sta
ti
on
STBDThrottle PORTThrottle
STBDGear
PORTGear
DCPWR
Bond
EngineHarness20'
Terminating
Resistor
ToIgn.SwitchCntr.
TopMountControl
GearHarness
ExistingJumper
inenginecntr.
ToStartInterlockCntr.
ToThrottleCntr.
ToIgn.SwitchCntr.
ExistingJumper
inenginecntr.
Installation Preview
For a larger version of this drawing
see Appendix (sec. 2.0, pg.17)