Cap
FIGURE 10
4) Squeeze the sealing ring to elongate and remove the inflator body
through the sealing ring (Fig. 11).
Red Indicator
Inflator Body
Sealing Ring
FIGURE 11
5) Dispose of the used inflator body.
Red Indicator
Trash
FIGURE 12
6) Check that the inflator body indicator is green. Insert the new inflator
body with CO
2
cylinder pointing upward inside the Inflatable PFD
(Fig.13). Let the sealing ring rest on the adapter around the four lugs.
10 Inflatable PFD Owner’s Manual Inflatable PFD Owner’s Manual 11