Raritan Engineering PST*03 Marine Sanitation System User Manual


 
7
INSTALLATION
MOUNTING
Treatment Tank
WARNING: DO NOT locate in an area where
ambient temperature exceeds 120
o
F (49
o
C).
1. Locate top of treatment tank at or below
discharge of toilet and within six feet (1.5 m).
Note: If mounting treatment tank higher
than discharge. Contact Raritan
2. Make and secure mounting frame to flat
surface.
3. Secure tank to frame using 3/4" (1.9 cm)
mounting straps.
Note: Placing a 3/8" (.9 cm) rubber pad under tank
will help to reduce vibration and noise.
Switch Panel
Note: Cable supplied is 12 feet.
1. Locate in head compartment where indicator
lights will be visible.
2. Using template provided, mark the cutout for
the panel.
3. Route cable between Switch Panel and
Purasan Treatment Unit.
4. Attach wires per wiring section to back of
switch panel.
5. Mount panel using 4 screws. Apply a bead of
nonpermanent sealant around rear edges of
panel if located in shower area.
Purasan Tablet Dispenser
1. Locate bottom of Tablet Dispenser a minimum
of 15” (38 cm) above the top surface of the
Treatment Unit or top of vented loop (if used).
2. Locate Tablet Dispenser with a minimum of
8” (20 cm) of clearance for removing the lid
and periodically changing the cartridge.
Note: Supplied tubing to connect intake water
to dispenser is 6 feet (1.8 m) in length.
3. Attach to wall or suitable structure using 1/4”
(6 mm) bolts.
IMPORTANT: Do Not load Tablet Cartridge
into Tablet Dispenser at this time. Load
Tablet Cartridge after completing Start Up
procedure.
Treatment Unit Mounting
14 1/8"
(35.9cm)
Mounting Frame*
1" (2.5cm)
Mounting
Straps -
not
included
INTAKE
DISCHARGE
1" (2.5cm)
7"
(17.8 cm)
Crossover Plug
15” or
higher