Sterling SGFE Marine Battery User Manual


 
Af ter the first 100
hours of ope ra ti on: Chan ge the oil on the ro ta ry val ve pumps
Fol low the ma nu fac tu rer’s ope ra ting in struc tions
Af ter 500 hours
of ope ra ti on: Check oil le vel and con di ti on of the oil in the gear
box of the ro ta ry lobe va cu um pumps
Fol low the ma nu fac tu rer’s ope ra ting in struc tions
Af ter 20,000 hours
of ope ra ti on: Re mo ve old grea se from anti-fric ti on bea ring
of side vane va cu um pump and ap ply fresh grea se
Fol low the ma nu fac tu rer’s ope ra ting in struc tions
F
The gi ven main ten an ce in ter vals are aver age va lu es.
Check whet her in your in di vi du al case the main ten an ce in -
ter vals must be shor te ned.
816-4MS
Main ten an ce sche du le
Main ten an ce 4-4