Sterling SSk-3 Marine Battery User Manual


 
4.1. Main te nance in ter vals
Daily: Check warn ing signs on equip ment for good
leg i bil ity and com plete ness.
With com pressed-air valve:
check the oil level in the oiler
empty the wa ter sep a ra tor
check the op er at ing pres sure in the fac tory
ductwork sys tem
(max. 6 bar (87.02 PSI) sys tem overpressure)
Ev ery six months: Check all elec tri cal and me chan i cal
con nec tions for proper fit
Check the set tings of the level probes
Check the seal ing rings on the lock ing flaps
Yearly: Re place the seal ing rings on the lock ing flaps
016-3MS
SSK-3
Main te nance 18