2.1. Gen eral in for ma tion
Un pack all parts of the sin gle con veyor unit and make sure that ev ery thing is
avail able:
·
con veyor hop per with level probe (1)
·
con trol and main te nance unit (2)
·
in jec tor tube (3)
·
sup ply hose (4) with 2 hose clamps
·
com pressed-air hose
·
op er at ing in struc tions
006-4MS
SSV 05
In stal la tion in struc tions 14
1
0
2
4
1
3