1. HOW TO INSTALL THE SYSTEM
1-8
Bulkhead installation
1. Mark locations for four self-tapping screws on the installation location.
2. Insert two self-tapping screws (6x30, supplied) at the top two screw holes, leaving
approx. 5 mm of the screws exposed.
3. Hang the processor unit on the two screws inserted at step 2.
4. Insert two self-tapping screws at the bottom of the unit.
5. Tighten all screws.
Note: The processor unit must be installed on the bulkhead with the following direc-
tion.
Self-tapping screw
(6x30, 4 pcs.)
UP
OK
NG