3 Installation
3-1 Work Rules
The installation, operation, and maintenance of this equipment
must be conducted in accordance with all applicable work and
safety codes for the installation location. This may include, but is
not limited to OSHA, NEC, CSA, and any other local, national,
and international regulations.
Read and follow these instructions when installing,
operating, and maintaining this equipment. If the instructions
become damaged or unreadable, obtain additional copies
from Sterling/Sterlco.
Only qualified personnel familiar with this equipment should
work on or with this hot oil temperature control unit.
Work with approved tools and devices.
Disconnect the electricity before maintenance or service.
If the unit is installed with a power cord that can be un-
plugged, unplug it. If the unit is permanently wired to a
power main, make sure that a fused power disconnect is
installed to allow the disconnect to be locked in the OFF
position. Open and lock out the disconnect installed in the
control enclosure.
3-2 Installation Requirements
Make sure that you meet the following requirements when
installing and operating your 6017 hot oil temperature control unit.
Installation Location Considerations
Locate the 6017 unit as close as possible to the process for proper
circulation and temperature control. Take care when selecting a
location. The area surrounding the unit must be free of obstructions
to ensure proper ventilation of internal components. Allow a
minimum clearance of at least 30 inches (76 cm).