A SERVICE OF

logo

Integrated Cleaner Operation
A40-039 Rev 1 Page 13
4 Operation
4.1 Location
Place the cleaner on a flat well drained surface.
Allow at least 2 inches of space on the right side to exhaust cooling air.
Caution: Do not remove the feet from the cleaner or block air flow to the bottom panel. The
cooling fan draws from the bottom and the ultrasonic generator will be damaged if air
flow is not provided.
4.2 Plumbing Connections
The cleaner is provided with a valve for the drain and a threaded cap on the fill fitting. The
drain valve is shipped loose and must be installed prior to filling the cleaner.
Install the ½ npt valve on the drain fitting. Connect this valve to drain in accordance with
local wastewater regulations.
If the fill fitting is connected to a public water supply, install a back flow preventer to ensure
that cleaning solution does not get drawn into the water supply pipes.
4.3 Electrical Connections
Check the specification label on the back of the cleaner for power requirements. The supply
voltage must be within ±10% of the specification label voltage. Do not place the cleaner on a
circuit that could become overloaded.
Position the cleaner within easy reach of a standard grounded electrical outlet.
Plug the cleaner into a grounded and fused receptacle.
Note: Do not use a ground fault protected (GFI) circuit. Normal leakage from the RF circuit will
trip the protector. Ground leakage is less than 500µA.
Figure 4-1 Specification Label
