Furuno 1850WDF Marine GPS System User Manual


 
4. INCORPORATION OF DGPS BEACON RECEIVER KIT (for GP-1850WF)
4-3
Installation of beacon receiver
Procedure
1. Dismount chassis assembly from panel/chassis assembly by disconnecting the
connector and PH8P from J8 on MAIN Board shown in the figure below.
Dismounting chassis assembly
2. Dismount heat sink from chassis assembly by unfastening three screws on the ANLG
board, loosening two screws at TR fixing plates and disconnecting the connector of the
mini pin coaxial cable.
Chassis assembly