Intel SC5300 BRP Life Jacket User Manual


 
Maintaining Your Server
Intel® Server Chassis SC5300 User Guide 47
Replacing a Power Distribution Board
WARNINGS
Hazardous conditions, power supply: Hazardous voltage, current,
and energy levels are present inside the power supply. There are no
user-serviceable parts inside it; servicing should be done by technically
qualified personnel.
1. Disconnect power to the chassis after shutting down the server.
2. Remove the Primary Access Cover (see “Remove Primary Access Cover” in Chapter 2 for
step-by-step instructions).
3. Remove the Air Ducts (see “Remove Air Ducts” in Chapter 2 for step-by-step instructions).
4. Remove shipping screw (letter “A”) securing Hot Swap Power Supply to chassis, if necessary.
Press on green latch (letter “A”) while pulling on handle to remove Hot Swap Power Supply
from chassis. Repeat this step for second Hot Swap Power Supply if one is installed.
TP00558
A
B
Figure 55. Removing Hot Swap Power Supply
5. Disconnect all internal power cables from chassis components and server board.