Simrad RGC12 Boating Equipment User Manual


 
Installation Manual
20220737B
13
3.3 Logistics
Safety: Refer to general safety procedures
Personal qualifications: Trained mechanical workers
Minimum number of personnel: 1
Ship location: No recommendations
Special tools required: Terminal connector tool supplied
with equipment
3.4 Terminal connector tool
All terminal connections are by self locking crimp terminals.
A special connector tool is located in a plastic bag inside the
Control Box.
Insert the tool such that the hook enters the slot above the cable
entry. Press down the shaft to open the wire lock mechanism
and insert the wire. Release the pressure and lift out the tool.
The wire is now locked and secured.
3.5 Caution in Installation
1. Install the RGC12 Master Compass so that horizontal base
datum lines coincides with the ship’s fore and aft line. See
Figure 4-1, page 17.
2. Ensure that the service space shown in the installation
drawing is provided. See Figure 4-2, page 18.
3. Install the RGC12 Control Box at a convenient place easy
to operate and easy to access for inspection and service.
4. Since the spring-pressure type terminal boards are
applied in the Control Box for cable connections, do not
connect several wires to one terminal.