Emerson Process Management ETC01035 Marine Instruments User Manual


 
ATEX Instruction Manual
ETC01035
August 2005
MLT 2 / BINOS
®
100 F
Emerson Process Management Manufacturing GmbH & Co. OHG
2 - 1
SECTION 2
Installation
Before starting to install this equipment, read the corresponding sections of the
analyzer’s instruction manual and the manuals of the additional equipment!
Failure to follow the safety instructions could result in serious injury or death.
2-1 General
Proper functioning of the Emerson Process
Management gas analyzers depends on
proper installation. All procedures in this
section, in the corresponding sections of the
analyzer instruction manual and the manuals
of the attached safety devices must be
followed carefully.
2-2 Installation of the Unit
Install the assembled unit as described in
the analyzer’s instruction manual: Refer to
the dimensional drawings in this manual
(fig. 2-1a/b and 2-2a/b) to ensure the
designated location is dimensioned
sufficiently.
Take care to use anchors and bolts
specified to be used for the weight
of the units!
Take care the wall or stand the unit
is intended to be installed at is solid
and stable to hold the units!
Instruments inclusive
EEx p unit may weigh up
to 40 kg (depending on
installed options)!
Use two person and/or
suitable tools for transpor-
tation and lifting these
instruments!
Do not use the attached EEx p unit or the external valve as a handle for
transportation or lifting the instrument! Failure to follow may loosen or
damage the devices and impair safety of the whole instrument!
EXPLOSION HAZARD !