Emerson Process Management ETC01035 Marine Instruments User Manual


 
MLT 2 / BINOS
®
100 F
ATEX Instruction Manual
ETC01035
August 2005
Emerson Process Management Manufacturing GmbH & Co. OHG4 - 4
4-4-2-1 Preparations
To carry out the routine tests the following
steps have to be performed:
Disconnect the analyzer and the
pressurization unit from power.
Seal the purge medium outlet at the
pressurization unit (1“ opening at the left
side).
Disconnect the containment system
gas connectors from the external gas
lines.
Disconnect one of the containment
system gas connectors inside the
analyzer and seal the other one.
(Remark: Now it must be possible set
the enclosure under pressure by
applying an external gas (e.g.
compressed air) to the gas connector.)
Connect an external source of
compressed air as described in the
drawing on the next page (fig. 4-2).
4-4-2 System with 90 mbar Operating Pressure
Required tools:
Manometer with full scale between
150 and 200 mbar and resolution of
0.1 mbar.
Flow meter with full scale between 5
and 10 l/min, resolution 0.1 l/min.
Test gas: Compressd air or Nitrogen,
pressure reduced to max. 1,500 hPa.
Pressure regulator to reduce the pressure
to values of 95 resp. 143 mbar.
Equipment for flow regulation
1 plug to seal the purge gas outlet
(size 1“)
1 plug to seal gas outlet (size 6 mm)
4-4 Verifications and Tests