Graco 312497G Scuba Diving Equipment User Manual


 
Repair
10 312497G
Section 3: Purging Air from Pump to Master Divider Valve Lines
Steps 1-3, refer to FIG. 8.
1. Install the line from the system pump to the master
divider valve, but do not completely tighten the con-
nection at the master valve’s lube inlet.
2. Cycle the system pump until air-free lubricant is
observed flowing from the line at the master divider
valve’s lube inlet.
3. Tighten the fitting at the lube inlet port while lubri-
cant is still flowing.
The system is now ready for operation.
FIG. 8
TI11114
BLEED THROUGH
SECONDARY
MASTER
ALL PORTS
SYSTEM PUMP
LUBE POINT