9
Section 2.0 — Installing the EEC3
To attach the throttle and transmission cables to the Control
Processor:
1. Find the appropriately labelled connector for the cable you
wish to connect to the CP (ie. THROTTLE / PORT or STBD;
GEAR / PORT or STBD).
2. Insert the cable connector fully until you hear a “click” from
the locking tab. This assures that the connector is fully inserted.
When all connectors are properly connected to the Control
Processor you may proceed to connect the other end of the
cable to the engine’s appropriate recepticle (whether for Port or
Stbd, or Throttle or Transmission).
2.6 Connecting the Troll Harness
Port and Starboard TROLL cables are attached to the EEC-2001 Control Processor at
the appropriately labelled connector of the Control Processor (see right).
To attach the TROLL cables to the Control Processor:
1. Find the appropriately labelled connector for the cable you wish to connect to the CP
(ie. TROLL Stbd / TROLL Port).
2. Insert the cable connector maintaining correct pin alignment.
2.7 DC Power Input and Bonding Wire
In the installation of any electronic device, the source of power is one of the most important factors to consider during the
installation. The Glendinning Electronic Engine Control has a unique and very reliable power supply system which, if the
system is properly installed, greatly improves the overall reliability of the engine control system. NOTE:The EEC can use
12 or 24V DC power, however, see the specific wiring diagram (see sec 4.0, or supplied by GMP technician) for the cor-
rect power to use. In some installations it is required to use 24V DC instead of 12V DC.
The Glendinning EEC3 system is equipped with a sophisticated power management system that allows it to receive power
from two (2) independent batteries (normally the port and starboard engine start batteries). In normal operation, the EEC3
will receive power from both battery sources, taking power from each battery proportionate to the voltage from level avail-
able. In the event of loss or reduction of voltage from one battery source, such as during engine start, the EEC3 system
will continue to function normally by receiving power from the other battery with normal voltage.
1) Connect the EEC3 DC Power Cable (supplied) to two (2) independent battery sources, (normally the port and starboard
engine start batteries). On the positive side of these two runs, install a 10amp circuit breaker near each battery or power
source (follow ABYC standards which require a circuit protection device within 7” of the wire connection to the power source
— NOTE: If the total wire run is longer than 15 feet from the battery to the Control Processor, install an approved junction
Connect
Throttle Harness
Connections Here
Connect
Gear
Harness
Connections
Here
D
C P
wr
BO
ND
PO
RT
Troll
CP
Enable
STBD
Troll
PORT
Gear
PO
RT
Throttle
Start
Interlock
STBD
Throttle
STBD
G
ear
Station
S
tation
D
C
Pw
r
BON
D
POR
T
Troll
CP
Enable
STBD
Troll
PO
RT
G
ear
PO
RT
Throttle
Start
Interlock
STBD
Throttle
STBD
G
ear
Station
Station
Connect
Troll Harness
Here
Verify that you have the right harness for
your engine type. If not, call GMP or your
dealer promptly!