4. OUTDOOR INSTALLATION
4-3. Piping Direction
4-3-1. Lifting method
· When lifting the unit with ropes, run the ropes under the unit and use the lifting hole.
· Support the unit at four points with two ropes, and avoid giving mechanical shock.
· Suspension rope angle must be 40° or less, so as to avoid compressing fan guard.
· Use two ropes, each at least 8m [26 ft.] in length
· Use ropes strong enough to support the weight of the unit.
· Always suspend the unit from four corners. (It is dangerous to suspend a unit from two corners and must not be attempt
-
ed.)
· Use protective pads to keep the ropes from scratching the panels on the unit.
8 [26]
8 [26]
40
°
· Products weighing more than 20 kg [45 LBS] should not be carried alone.
· Do not carry the product by the PP bands.
· To avoid the risk of injury, do not touch the heat exchanger fins.
· Plastic bags may pose a risk of choking hazard to children. Tear plastic bags into pieces before disposing of them.
· When lifting and transporting outdoor units with ropes, run the ropes through lifting hole at the unit base. Securely
fix the unit so that the ropes will not slide off, and always lift the unit at four points to prevent the unit from falling.
Exercise caution when transporting products.