Furuno CSH-84 SONAR User Manual


 
3-6
Installing stays (anti-vibration measure)
Install stays from the top of the hull unit to the ship’s hull. The stays should be angle iron with
a size of 75 x 75 x 9 mm or more and at least two pieces should be used; one each to ship’s bow
and stern directions. If possible, install two more stays in ship’s transverse direction.
Stay
Stay
Hull Unit
Figure 3-7 How to install stays
Do not install the stays vertically as shown below. Vibration-resistance effect is reduced since
vibration is applied to the stays as rotation force. Install them horizontally.
Crossbeam
on ceiling
Proper installation
90°
Hull
Unit
Eye bolt
Stay
Figure 3-8 Proper and improper installation of stays
Fastening receiver unit to hull unit
Fasten the receiver unit to the left side of the hull unit as
shown at right.
A transducer cable protection cover has been fitted where
the receiver unit is to be fastened to the hull unit. Re-
move it when mounting the receiver unit.
Figure 3-9 Fastening the
receiver unit to the hull unit
Raise/Lowe
r
Control Box
(Attached at
factory)
Receiver
Unit