SUPER MICRO Computer 2022G-URF Life Jacket User Manual


 
2-8
A+ SERVER 2022G-URF User's Manual
Figure 2-6. Installing into a Rack
Ball-Bearing
Shuttle
Standard Chassis Installation
Stability hazard. The rack stabilizing mechanism must be in place, or the rack
must be bolted to the oor before you slide the unit out for servicing. Failure
to stabilize the rack can cause the rack to tip over.
Installing the Chassis into a Rack (Figure 2-6)
1. Extend the outer rails as illustrated above.
2. Align the inner rails of the chassis with the outer rails on the rack.
3. Slide the inner rails into the outer rails, keeping the pressure even on both
sides. When the chassis has been pushed completely into the rack, it should
click into the locked position.
4. Optional screws may be used to secure the to hold the front of the chassis to
the rack
Note: The gure above is for illustrative purposes only. Always install servers to
the bottom of the rack rst.
Caution: Do not pick up the server with the front handles. They are designed
to pull the system from a rack only.