Emerson Process Management MMI-20015440 Marine Instruments User Manual


 
Installation and Configuration Manual 25
Installation (Long Stem)
Installation (Short Stem) Electrical ConnectionsInstallation (Long Stem)Introduction
Figure 3-4 Keeping tines away from objects and disturbed flow (open tank)
5. If there is flow, align the tines such that the flow is directed towards the gap between the tines
(see Figure 3-5).
Figure 3-5 Aligning the tines in flow (Open-tank)
6. Keep away from deposit build-up (see Figure 3-6).