Furuno FR-2135S Marine RADAR User Manual


 
1-3
How to lift scanner unit
1. Fix the scanner radiator to the scanner unit chassis.
2. Attach the lifting fixtures and collars as shown in Figure 1-2 and 1-3.
3. Position the radiator as shown in Figure 1-3 and arrange the ropes A
=
.
.
2m
and B
=
.
.
1.8m.
Lifting fixture
Collar for fixing
Supplied as installation
materials. Remove after
installation.
Hex bolt (M12X20)
Spring washer (M12)
Remove lifting fixture, coat threads
of hex bolts with silicone grease, and
then insert bolts in scanner body.
Lifting hook (2 pcs.)
Figure 1-2 Attachment of lifting fixtures and collar
*
*
* Protect radiator with
cardboard or cloth at
locations marked with
asterisk.
A=2.0m
.
.
B=1.8m
.
.
Figure 1-3 Attachment of ropes