INSTALLATION This section contains the following installation topics:
• “Pre-Installation” on page 7
• “Installation Procedures” on page 8
• “Start-Up Sequence” on page 21
Pre-Installation The pre-installation checklst and site planning must be performed before
installing the equipment at the site.
Receiving The equipment required for each installation includes:
• PowerLogic E4800 meter (PowerLogic E4833, PowerLogic E4880 or
PowerLogic E4805)
• for the PowerLogic E4833 and PowerLogic E4880, one 12-ft (4-m)
AMP cable with one 50-pin connector supplied with each unit
• for the PowerLogic E4805, two Mate-n-Lok
TM
wiring harnesses
supplied with each unit
• CD containing meter configuration software, this installation manual
and an installation record form
When you receive your order, verify that the items listed above are included
with the shipment, and visually inspect them for damage. If any parts are
missing or damaged, contact your Schneider Electric representative.
Pre-Installation Checklist The installer must provide the following information, tools, and equipment
before proceeding with the installation:
• certified current transformers for metering (not supplied)
• an appropriate 20-Amp maximum circuit breaker or a fused disconnect
switch for the type of panel
• current/voltage meter to test the phasing of panels
• RJ45 Ethernet patch cable
• 4-wire 14 AWG (1.63 mm
2
) cable for three-phase wye connected
circuits, or 3-wire 14 AWG (1.63 mm
2
) cable for a single-phase wye
connected circuits
• small flat-head screwdriver
• #2 Phillips screwdriver
• crimping tool
• 18 AWG butt splice connector
• wire strippers
• four 1-inch (25 mm) #8 mounting screws suitable for selected mounting
surface
If using a modem, these items are also required:
• phone or butt set to test the phone line
• RJ11 patch cable
• xDSL filter if required (many businesses have their internet access on
the same line as the fax)