Schneider Electric E4800 Marine Instruments User Manual


 
930-110-01 PowerLogic
TM
E4800 Series
02/2009 Installation
© 2009 Schneider Electric All Rights Reserved
13
For a three-phase wye panel (see Figure 7), connect:
meter terminal A to the voltage disconnect phase A (red wire)
meter terminal B to the voltage disconnect phase B (black wire)
meter terminal C to the voltage disconnect phase C (blue wire)
meter neutral terminal to neutral bar in the voltage disconnect panel
(white wire)
earth wire to earth terminal using lug provided
Figure 7: PowerLogic E4800 meter 208Y/120V three-phase wye service
connection
8
4
5
7
3
6
2
1
Legend:
1 BX cable
2 0.75-inch (1.9-cm) strain relief
3 Earth terminal
4 Phase B (black)
5 Phase C (blue)
6 Terminal block (J3)
7 Neutral (white)
8 Phase A (red)