AEG 8000012364 BAL Marine Battery User Manual


 
"UniVert 2" inverter
Page 34 of 42 8000012364 BAL, en
- Power cables...............................Burst test in acc. with
EN 61000-4-4, 2 kV
Surge test in acc. with
EN 61000-4-5,
2 kV asymmetrical
- Control cables .............................Burst test in acc. with
EN 61000-4-4, 2 kV
Surge test in acc. with
EN 61000-4-5,
2 kV asymmetrical
Functional extra-low voltage..........With safe isolation at U
O
60 V DC
to VDE 0100 Part 410 11.83
Section 4.3.2
Overload behaviour .......................1.6 x rated current for 1 minute
1.3 x rated current for 10 minutes
The mains fuse used must be
taken into consideration!
Max. load fusing ............................gL 40A
Messages ......................................- Operation LED green
- INV voltage present LED green
- Mains volt. present LED green
- Synchronism LED green
- INV supplies the load LED green
- SBS suppl. the load LED green
- Collective fault LED red
Remote signals (X4) ......................Collective fault signal via potential-
free relay contact X4.1,2,3
(safe isolation)
INV operation signal via potential-
free relay contact X4.4,5,6
(safe isolation)
Max. contact load:
150 V DC < 1.6 A
Min. contact load: 12 V 0.1 A
Monitoring systems........................ - Load undervoltage
- Load overvoltage
- Mains undervoltage
- Mains overvoltage
- Heat sink overtemperature
- Mains / INV synchronism
- Self-test, watchdog
- Internal auxiliary voltages
Design ...........................................19" mounting rail for installation in
module rack in acc. with
DIN 41494