Sterling SSP 5 Marine Battery User Manual


 
4. Putting into op er a tion
»
This chap ter is in tended for op er at ing per son nel.
Pre req ui site for this chap ter is gen eral knowl edge of the op er a -
tion of con vey ing units.
Also pre req ui site for this chap ter is that the func tional de scrip -
tion has been read and un der stood.
En sure in each case that the op er at ing per son nel are suf fi -
ciently in formed.
F
Ob serve the man ual of the con vey ing sys tem.
Make sure that the On/Off switch of the hop per loader con -
nec tion hous ing is in po si tion “1".
526-3MS
SSP 5
Putting into op er a tion 18