5.3. Re placing the out let flap seal ing ring
»
Stop the con vey ing pro ce dure.
Switch off the hop per by means of the on/off switch on the con -
nec tion hous ing.
Switch off the con vey ing con trol by means of the main switch.
Dis con nect the unit from mains sup ply.
Depressurize all sys tem sec tions of the equip ment.
Re move the ten sion ring (A).
Re move the up per part of the hop per
loader with hop per lid.
Draw the old seal ing ring off the noz zle of
the ma te rial out let.
In stall the new seal ing ring.
F
Ob serve the di rec tion of in -
stal la tion (B).
Set the flap switch.
In stall the up per part of the hop per loader.
In stall the ten sion ring (A).
In stall the hop per loader.
&
Or der num ber seal ing ring: ID 23098
526-3MS
SSP 5
Main te nance 25
SSP 5