Wayne-Dalton 8100 Windload Scuba Diving Equipment User Manual


 
15
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local
yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
Tools Needed:
Tools Needed:
INSTALLATION
13
Bottom Section
Center the bottom section in the door opening.
Level section using wooden shims under the bottom
astragal if necessary. Hold the section in the opening
while attaching vertical tracks.
Level
Wood Shims
Level
Header
Jamb
Bottom
section
Wooden
shims
Bottom
section
5/16 X 1-5/8”
Lag screws
Flagangle
Vertical track
assembly
Jamb
Bracket
Cable
Vertical Track
3/16” Drill Bit
Power Drill
7/16” Socket Driver
Tape Measure
Level
Step Ladder
IMPORTANT: THE TOPS OF THE VERTICAL TRACKS
MUST BE LEVEL FROM SIDE TO SIDE. IF THE BOTTOM
SECTION WAS SHIMMED TO LEVEL IT. THE VERTICAL
TRACK ON THE SHIMMED SIDE, MUST BE RAISED
THE HEIGHT OF THE SHIM.
Position the left hand vertical track assembly over
the rollers of the bottom section. Make sure the
counterbalance cable is located between the rollers
and the door jamb. Drill 3/16” pilot holes for the lag
screws.
Loosely fasten jamb brackets and flagangle to the
jamb using 5/16” x 1-5/8” lag screws. Tighten lag
screw securing bottom jamb bracket to jamb, to
maintain 5/8” spacing. Hang counterbalance cable
over flagangle.
Repeat for the right hand side.
Bottom section
Vertical
track
Roller
5/8”
F.A.T. FLAGANGLE
5/16” x 1-5/8”
Lag screw
Jamb bracket
Lag
screw
Locations
Weather
seal
Q.I. FLAGANGLE
Lag
screw
Locations