3-4
Rack-Mountable Server Installation
For use with 350-MHz or greater Intel processor-based servers only
Writer: Cheri Stewart Project: Compaq ProLiant 3000 Servers Setup and Installation Guide Comments: 179776-002
File Name: D-CH03.DOC Last Saved On: 1/12/99 1:24 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
WARNING:
Before beginning to work on the rack, be sure that
the leveling jacks are extended to the floor, that the full weight of
the rack rests on the level floor, and that either stabilizers are
installed or that multiple racks are coupled together for stability.
CAUTION:
Do not place anything on power cords or cables.
Arrange them so that no one may accidentally step or trip over
them. Do not pull on a cord or cable. When unplugging from the
electrical outlet, grasp the cord by the plug.
WARNING:
To reduce the risk of personal injury or damage to
the equipment, a minimum of two people
MUST
lift the server
into the rack. The server weighs about 50 pounds (22.6
kilograms). If the unit is to be loaded above chest level, a third
person must assist in aligning the rails while the other two
support the unit.