3-19
Compaq ProLiant 3000 Servers Setup and Installation Guide
For use with 350-MHz or greater Intel processor-based servers only
Writer: Cheri Stewart Project: Compaq ProLiant 3000 Servers Setup and Installation Guide Comments: 179776-002
File Name: D-CH03.DOC Last Saved On: 1/12/99 1:24 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
3. Insert the tip of the fitting tool through the other side of the perforation
and hook the opposite lip of the cage nut.
Figure 3-9. Inserting cage nuts
4. Using the fitting tool as a lever, pry the cage nut into position.
5. Repeat for each cage nut.
Attaching the Mounting Bracket Assembly
to the Rack
The tabs on the front of the mounting bracket help to align it with the front of
the rack frame. Cage nuts are not used for the front attachment of the mounting
bracket.