Simrad EQ60 SONAR User Manual


 
Simrad EQ60
188
857-164342 / Rev.C
Cable in steel conduit
It is strongly recommended to lay a steel conduit from the
transducer to the echo sounder transceiver, and draw the
transducer cable through the conduit. There are two reasons for
this procedure.
First, it will make it easier at a later stage to replace the
transducer.
Second, noise and interference from other electrical
equipment is greatly reduced.
With a steel conduit the installation satisfies the EU regulations
for EMC interference. Without a steel conduit, there is a risk of
reduced echo sounder performance.
Packing nipple
(CD1995)
Ø
3
5
Ø
6
5
Rubber
gasket
Stuffing
tube
Steel tube
Washers
Echo
sounder
Figure 30 Example steel tube arrangement