Emerson Process Management LF-Series Marine Sanitation System User Manual


 
LF-Series Flowmeters: Sensor/Transmitter Installation 21
Installing the DIN Rail Mount Transmitter
Installing the Sensor Installing the DIN TransmitterInstalling the FM TransmitterBefore You Begin Installing the Sensor Installing the DIN TransmitterInstalling the FM TransmitterBefore You Begin Installing the Sensor Installing the DIN TransmitterInstalling the FM TransmitterBefore You Begin Installing the Sensor Installing the DIN TransmitterInstalling the FM TransmitterBefore You Begin
To ground the transmitter, ground the DIN rail. A rail clip in the base of the transmitter housing
grounds the transmitter to the DIN rail.
4.5 Supplying power
In all installations, power must be provided to the transmitter. Refer to Section 4.2.3 for information
on the transmitter’s power supply requirements.
Connect the power supply to terminals 11 and 12. Terminate the positive wire on terminal 11 and the
negative wire on terminal 12. See Figure 4-4.
Terminals 13 and 14 are used to jumper power to another LF-Series DIN transmitter. A maximum of
five transmitters can be jumpered together.
Figure 4-4 Wiring the transmitter power supply
+
+
Power supply jumper to a
maximum of four other
LF-Series DIN transmitters
Primary power supply
(DC)