Predicted Demand
The power meter calculates predicted demand for the end of the present interval for kW,
kVAR, and kVA demand. This prediction takes into account the energy consumption thus
far within the present (partial) interval and the present rate of consumption. The prediction
is updated every second.
Figure 4–6 illustrates how a change in load can affect predicted demand for the interval.
Peak Demand
In non-volatile memory, the power meter maintains a running maximum for the kWD,
kVARD, and kVAD power values, called “peak demand.” The peak for each value is the
highest average reading since the meter was last reset. The power meter also stores the
date and time when the peak demand occurred. In addition to the peak demand, the power
meter also stores the coinciding average 3-phase power factor. The average 3-phase
power factor is defined as “demand kW/demand kVA” for the peak demand interval.
Table 4–2 on page 30 lists the available peak demand readings from the power meter.
You can reset peak demand values from the power meter display. From the Main Menu,
select MAINT > RESET > DMD. You can also reset the values over the communications
link by using software.
NOTE: You should reset peak demand after changes to basic meter setup, such as CT
ratio or system type.
The power meter also stores the peak demand during the last incremental energy interval.
See “Energy Readings” on page 35 for more about incremental energy readings.
Generic Demand
The power meter can perform any of the demand calculation methods, described earlier in
this chapter, on up to 10 quantities that you choose using PowerLogic software. For generic
demand, do the following:
Select the demand calculation method (thermal, block interval, or synchronized).
Select the demand interval (from 5–60 minutes in 1–minute increments) and select
the demand sub-interval (if applicable).
Select the quantities on which to perform the demand calculation. You must also
select the units and scale factor for each quantity.
For each quantity in the demand profile, the power meter stores four values:
Partial interval demand value
Last completed demand interval value
Minimum values (date and time for each is also stored)
Peak demand value (date and time for each is also stored)
Figure 4–6: Predicted Demand Example
1:00 1:06 1:15
PLSD110137
15-minute interval
Predicted demand if load is
added during interval;
predicted demand increases
to reflect increase demand
Predicted demand if no load
is added.
Time
Change in Load
Demand
for last
completed
interval
Beginning
of interval
Predicted demand is updated every second.
Partial Interval
Demand