A SERVICE OF

logo

Microplate Luminometer Installation and Commissioning
22
0
100V
120V
230V
240V
I
Power switch Power cord Fuse holder White pin at 115 V
Connect the luminometer and your PC or laptop to the serial
communication port using the supplied connection cable
which is provided with female connectors on both ends.
When the wall socket and operating voltage match, connect
the luminometer to the wall socket using the supplied cable.
Turn the Microplate Luminometer on at the power switch (in-
strument rear panel). The green LED (1
st
from left) lights up
and signals that the instrument is ready for operation.
Perform a quick hardware test to check the microplate trans-
port unit: open the instrument door and move the microplate
transport unit by hand away from the home position. Now turn
the instrument off and on again. After power is on, the mi-
croplate transport unit moves to the home position (audible
and, with open the instrument door, visible movement). If the
transport unit does not move to this position, please contact
the Technical Service Department at 1-800-825-5832.
If you have not done so yet: connect the computer to the
printer and connect both devices to the wall socket.
Figure 3-2:
Fuse holder with
indication o
f
operating voltage
0
100V
120V
230V
240V
I
Instrument rear
panel
PC connection
Connection
injector unit