A SERVICE OF

logo

Microplate Luminometer Installation and Commissioning
24
Pass injector tubing 1 to injector pump 1 and finger-tighten
the fitting screw in the pump head (left connection = OUT).
Proceed in the same manner with injector tubing 2. Pass the
injector tubings at the MONOLIGHT 3096 over the rubber
foam piece and at the injector unit through the openings
on the side.
Injector head Opening for injector tubings
to MONOLIGHT 3096 to reagent bottles
Cut the tubings connected to the IN ports (right) of the pumps
to the length you need and connect them to your reagent bot-
tles. Make sure the tubings are long enough to pass them
through the openings on top of injector unit and to the bottom
of the reagent bottles standing on the tray attached to the front
of the injector unit.
Close the injector unit again by inserting the locking door ver-
tically from above. Pass both slots on the bottom side of the
door through the openings at the bottom of the injector unit,
the two slots on top of the injector unit through the openings
on the door.
Close the service door at the MONOLIGHT 3096 very carefully
to prevent any light from entering the measurement chamber:
Figure 3-4:
MONOLIGHT 3096
with connected
injector unit
(both devices open)
Injector pumps
Tray for reagent bottles
OUT IN
1 2
1
2
Injector
pump 2