SG-60 High Intensity Strobe System 2-17 Manual EPM-00000019 Rev A
and the connection should be at the top end of the junction box.
Wiring from ports in the sides of junction boxes should also be
made such that the wire nuts are at the top of the junction box
with the wire nut openings pointing downward, (see Figure 2-6,
Page 2-19) for proper moisture protection.
(f) Move down to the next intermediate (strain relief) junction box and
pull enough of the wiring into the box to provide for the proper
installation of the strain relief mechanism.
(g) Move down to the next intermediate junction box and repeat the
above procedure until the entire tower is wired.