AEG PV.630 Marine Battery User Manual


 
Protect PV.630 Maintenance and Servicing
80000047962 BAL 5 of 14
4 Maintenance and Repair
4.1 General Information
The installed AEG Power Solutions system contains high-quality,
durable parts and components, which are coordinated with one
another in order to provide the best possible conditions for system
operation. To maintain the functional reliability of the system and to
make sure it continues to deliver optimum energy yields, the fol-
lowing steps need to be performed on a regular basis:
Regular inspection of system operation
Annual system maintenance
Servicing according to the duration of operation
Observe the applicable country-specific standards and direc-
tives.
i
The operator or their designated representative is respon-
sible for the system whilst maintenance work is being car-
ried out; he or she also coordinates the work itself.
The person appointed to maintain the system is responsi-
ble for the work carried out on the system section as-
signed to him or her.
Contact with voltage! Extremely high DC voltages of
up to 1000 VDC are present.
Risk to life due to electric shock.
Do not touch live parts.
Wear personal protective equipment.
4.2 Scope of the Recommended Measures
We recommend carrying out the following work:
Task Interval
Inspection 1 - 3 months, depending on installation site
Function test 6 months
Maintenance 12 months
Servicing According to number of operating hours worked
DANGER