AEG PV.630 Marine Battery User Manual


 
Protect PV.630 Installation and Start-up
80000047963 BAL 11 of 21
4.6 Installation and Assembly in the Event of Control Cabinets Being Supplied
Separately
Inadequately qualified and untrained skilled person-
nel can damage the system!
This can cause considerable damage to equipment.
Only qualified skilled personnel trained by the manu-
facturer may install and assemble the individual control
cabinets (if they are supplied separately).
i
If the control cabinets are supplied separately, the sealing
strip provided must be stuck in place between them (run-
ning all the way around) before the system is installed.
The control cabinets must also be bolted together at the
appropriate points.
4.7 Installing, Aligning, Attaching
Four holes are provided for the fixing bolts in the frame of each
control cabinet.
The spacings and diameters of the holes can be found in the draw-
ing below.
Align the system vertically and compensate for any uneven-
ness.
Attach the system to the floor.
Bolt individual cabinets at the appropriate points (through the
frame at the top and at the vertical posts at the front and back).
660
925
1500 1200
600
625
Figure 5 Bottom attachment
ATTENTION